Monday, 21 October 2013
20th October 2013 - Test the Website
Tested if the website got loaded as it was created by checking the website when live. Checked if all the pages were as per the design specifications.
Sunday, 20 October 2013
18th October 2013 - Test Completed Pages Against Design Specifications
Test each page against the design specifications and the selected design.
17th October 2013 - Test Completed Pages Against Design Specifications
Test each page against the design specifications and the selected design.
16th October 2013 - Test Completed Pages Against Design Specifications
Test each page against the design specifications and the selected design.
15th October 2013 - Create All Pges Of The Website
Create the “home” page – using weebly.
Create the “about us” page – using weebly.
Create the “gallery” page – using weebly.
Create the “blog” page – using weebly.
Create the “contact” page – using weebly.
Create the “about us” page – using weebly.
Create the “gallery” page – using weebly.
Create the “blog” page – using weebly.
Create the “contact” page – using weebly.
Saturday, 19 October 2013
14th October 2013 - Prepare Create Stage Proccess
With all the information in hand so far, draw up a list in a sequence for the entire create stage process.
13th October 2013 - Logo design Selection
Select or design a logo for the website and the logos for the social media icons. This is the modification that was introduced after checking the original design specifications.
12th October 2013 - Main Picture Selection
Select the main picture that shall appear on all pages of the website.
11th October 2013 - Check Contact Page Against Design Specifications
Compare and check the fifth page which is the “contact” page against the design specifications and the selected sample design.
11th October 2013 - Check Blog Page Against Design Specifications
Compare and check the fourth page which is the “blog” page against the design specifications and the selected sample design.
11th October 2013 - Check Gallery Page Against The Design Specifications
Compare and check the third page which is the “gallery” page against the design specifications and the selected sample design.
11th October 2013 - Check About Us Page Against Design Specifications
Compare and check the second page which is the “about us” page against the design specifications and the selected sample design.
11th October 2013 - Check Homepage Against Design Specifications
Compare and check the first page which is the “home page” against the design specifications and the selected sample design.
10th October 2013 - Page Content Planning
Divide the website into the different pages and draw up a plan of what shall be appearing on each of the pages.
10th October 2013 - Web Hosting and Domain Name
Check for the web hosting details and select the domain name.
10th October 2013 - Weebly Checklist
Go on to the online web builder and check that all the selected design specifications are able to be created using the online web builder – Weebly.
9th October 2013 - Resource List
Draw up a complete list of the resources that shall be required including research material and design stage material.
9th October 2013 - Final Design Selection
Select the one design out of the three draft designs and check the selected against the design specification list. Out of the three draft designs, the one selected was first checked against the design specifications, after which any issues raised or corrections that were required by Mr. Gioko were also considered.
9th October 2013 - Design Specifications Checklist
Check the entire list of the design specification in case any modification may be required. All the individual items in the design specification check-list were gone through and a modification was made which was to add a Logo to each page of the website. The Logo would give an identity to the website as well as to each individual page of the website.
Subscribe to:
Posts (Atom)