Monday, 21 October 2013

20th October 2013 - Test the Website

Tested if the website got loaded as it was created by checking the website when live. Checked if all the pages were as per the design specifications.

Sunday, 20 October 2013

19th October 2013 - Website Registration

Register the website.

18th October 2013 - Test Completed Pages Against Design Specifications

Test each page against the design specifications and the selected design.

17th October 2013 - Test Completed Pages Against Design Specifications

Test each page against the design specifications and the selected design.

16th October 2013 - Test Completed Pages Against Design Specifications

Test each page against the design specifications and the selected design.

15th October 2013 - Create All Pges Of The Website

Create the “home” page – using weebly.
Create the “about us” page – using weebly.
Create the “gallery” page – using weebly.
Create the “blog” page – using weebly.
Create the “contact” page – using weebly.

Saturday, 19 October 2013

14th October 2013 - Prepare Create Stage Proccess

With all the information in hand so far, draw up a list in a sequence for the entire create stage process.